Engineering and consulting
Load balances, drawings, generating plant, switchboards, conductors and short-circuit calculation. The job starts in the office, with the client.

Mar del Plata · Port and industry
Switchboards, cabling and CJC offline filters.
Engineers and technicians with experience on board and in industrial plants.
+40
years in the industry
PNA
approved switchboards
CJC
official distributors
What we do
Electrical and electromechanical work for shipowners and industrial clients.
Load balances, drawings, generating plant, switchboards, conductors and short-circuit calculation. The job starts in the office, with the client.
Design and installation on vessels, industrial plants and civil works. Cabling, trays, bulkhead penetrations and commissioning.
Design, fabrication, assembly and testing. All approved by the Argentine Coast Guard (PNA).
Control of equipment and processes, on board and in the plant.
Panels, detection and signalling for vessels and shore installations.
Cameras and access control, on board and in the plant.
Automatic generator-to-mains transfer and paralleling.
Switchboards for compressors, pumps and evaporator fans. Sensors, control logic and an operator display.
AC and DC motors and generators. Rewinding, bearings, balancing and a running test.
Panels, detectors and call points. Installations approved by the Argentine Coast Guard (PNA).
Official distributors. We install on board and provide after-sales service.
Projects
Renewal, modernisation and power upgrade of the vessel. Refrigeration, processing plant, fishing lights and generation.
Full rebuild of the vessel. Design, fabrication and electrical installation of accommodation, wheelhouse, holds and processing plant.
Complete engine-room electrical installation and distribution. A plant with four 400 kVA generators and one generator coupled to the 1,500 kW main engine, with remote start and automatic paralleling.
Design, fabrication and fitting. Navigation, emergency, power and crane switchboards, wheelhouse and accommodation lighting, and the fire panel.
Motors and generators. Shop rewinding and a running test.
Official distribution
The oil is cleaned with the machinery running. On a fishing vessel, the result is measured in water and in stoppages.
539 → 57 ppm
of water
Winch hydraulics, 3,000 litres. The oil had been condemned. After 30 days the oil was fit again. The unit paid for itself on the first day.
18 months
without stoppages
The engine kept failing on the diesel. Since the CJC filter was installed, no stoppages, and none on the engine oil or the hydraulic oil either.
Switchboards built by Propeller, all approved by the Argentine Coast Guard (PNA).
Work on board while the vessel is in port, and the same standard on industrial installations.
Electrical work and filtration. No need for two suppliers on the same sailing.
Contact
O’Higgins 1444, Mar del Plata. We answer directly, with no front desk.